Design Master Wish List

The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. 231 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  13 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Add the capability to make a note in panel schedules for special circuit breakers - HACR, SWD, etc.

    Would make sense to add a note field in the equipment connection creation form or in the circuiting form to tag individual breakers with specific requirements, possibly with a superscript which refers to a box of notes attached to the bottom of the schedule.

    170 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  8 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. Annotation Scaling / Multiple Scales on a Single Drawing

    Add support for annotative scale factors for blocks and text. This would allow blocks and text to be the same size in different scaled viewports.

    156 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  10 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  4. Upsize Wires Based upon Voltage Drop

    Automatically upsize branch circuit wires when necessary because of voltage drop.

    151 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  4 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Electrical Symbol Legend

    Add a Schedule of all blocks used in the project. This could be used a Symbol Legend for the Project.

    75 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Fire Alarms

    Add better support for fire alarm system design.

    Various improvements related to this suggestion include:

    Add 12V, 14V, 16V, 18V and 24V DC device support for Fire Alarm Systems

    Change loads from KVA to mA or even VA. Two load types should be
    available, standby power and alarm power for each FA device.

    Add ability for wiring such as 24, 22, 18, 16, and 14 awg.

    Add ability to perform standby and alarm battery ampere-hour
    calculations.

    Display length, current, voltage, and voltage drop for each circuit.

    Have fire alarm panels with appropriate attributes, such as alarm time, standby time, battery…

    66 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Subfeed Breakers on Panels

    Add a feature to handle subfeed breakers on panels.

    Currently, the workaround is to add additional poles to your panel and use those for the subfeed and mark the ones on the other side as unusable.

    64 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. VAV Box Schedule

    Create a schedule of VAV boxes, similar to the diffuser schedule.

    63 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →

    We are considering this for DM HVAC 7.1. Additional information about what you would like the schedule to look like would be helpful, either in the comments or emailed to us.

    In particular, examples of schedules you currently use would help a lot. I prefer Excel or DWG format over PDF if possible!

  9. Export Equipment List to Excel

    Export a list of equipment connections and information to a file that can be opened and viewed in Excel. The file would be for post-processing only. Any changes to the equipment would still be made using the other DM commands.

    53 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Generic Schedule Creator

    Have a way to create a generic schedule. The schedule will be informational purposes only, but it will be generated the same way as the other DM schedules so it will look the same.

    52 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  4 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  11. Set Room Exhaust Rate

    Specify the exhaust air requirements for rooms and use these numbers in the load calculations and duct design calculations.

    52 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  12. Diffuser Insertion at Corner (for Ceiling Grids)

    Have the option to insert diffusers at the corner of the diffuser, not the center. This change would assist in placing diffusers properly in ceiling grids.

    50 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  13. Swap & Copy Circuits

    When copying circuits in the swap and copy dialog, multipole breakers do not copy to the new location as multipole breakers, they copy as single pole. It appears that you have to set the number of poles and their positions in the circuiting dialog before starting the copy/swap routine.

    45 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  6 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Add multiple circuits to a single piece of equipment (ie. HVAC) one for each load.

    Some HVAC and other pieces of equipment require multiple circuits for multiple loads inside each unit. Currently I have to create 2 pieces of equipment with the individual loads, overlay them, then circuit them.

    42 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Insert Load Calculation Output on Drawing

    Insert the load calculation schedules on the drawing.

    39 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  16. Subfeed breakers

    Add specific support for subfeed breakers.

    Be able to set the number of subfeed breakers on a panel (similar to how the number of poles is currently set on a panel).

    Have the panel schedule update to document which breakers are subfeed. We likely would add a separator block between the branch circuit and subfeed breakers that you could customize. The default block would have a line across the schedule plus some text indicating branch circuit breakers above and subfeed below. You could then modify that as desired for your documentation purposes.

    34 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Change breaker size in Panel Schedule based on Revit family parameter

    Change breaker size in Panel Schedule based on Revit family type parameter.

    33 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical RT  ·  Flag idea as inappropriate…  ·  Admin →
  18. Make the note fields for panels and switchboard larger and editable

    We need the note fields for Panels and Switchboards to be larger and editable like the Description, Model, and Note fields in the Light Fixture Project Schedule.

    33 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. 32 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  3 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  20. 31 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
← Previous 1 3 4 5 15 16
  • Don't see your idea?

Design Master Wish List

Feedback and Knowledge Base