Design Master Wish List

The current releases are DM Electrical RT 1.1, DM Electrical 8.4, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.2, DM Electrical 8.5, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Provide Minumum air flow calculations

    If the minimum air flow is set in the calculation bases on a parameter such as air change rate, cfm/sq ft or a set cfm it would be nice to have that as a column in the calculation output.

    5 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      I agree to the terms of service
      Signed in as (Sign out)
      You have left! (?) (thinking…)
    • Add an option to the "Duct: Edit Multiple" dialog that allows users to choose whether to preserve duct endpoint connections or not.

      So if I query and individual duct section and change the elevation of either end, the ducts the ends are connected to also change elevation to preserve the connection between the endpoints. If I "edit multiple" on several duct sections and change the endpoint elevations, the other duct sections connected at those points do not change elevation to preserve the connection. Sometimes, changing the elevation of one endpoint without keeping any other endpoints attached is what I want, and sometimes I wish the connections were all preserved. I think there should be a drop-down, a radio button, or something on…

      1 vote
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        I agree to the terms of service
        Signed in as (Sign out)
        You have left! (?) (thinking…)
      • Diffuser Insertion at Corner (for Ceiling Grids)

        Have the option to insert diffusers at the corner of the diffuser, not the center. This change would assist in placing diffusers properly in ceiling grids.

        48 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          I agree to the terms of service
          Signed in as (Sign out)
          You have left! (?) (thinking…)
        • Ability to differentiate diffuser of different systems in the diffuser schedule

          Ability to differentiate diffuser of different systems in the diffuser schedule. i.e. turn on or off diffusers associated with New, existing and demo systems.

          1 vote
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            I agree to the terms of service
            Signed in as (Sign out)
            You have left! (?) (thinking…)
          • Export to eQuest or DOE2.2

            Be able to export building load information to eQuest or DOE2.2 using gbXML for energy modeling purposes, such as ASHRAE 90.1, LEED, and Title 24.

            29 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              I agree to the terms of service
              Signed in as (Sign out)
              You have left! (?) (thinking…)
            • 33 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                I agree to the terms of service
                Signed in as (Sign out)
                You have left! (?) (thinking…)
              • 11 votes
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  I agree to the terms of service
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                • Allow diffuser tags to be moved and modified with standard AutoCAD editing commands.

                  It would be helpful to not have to use the "special" DM commands to manipulate the diffuser tags.

                  20 votes
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    I agree to the terms of service
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                  • VAV Box Schedule

                    Create a schedule of VAV boxes, similar to the diffuser schedule.

                    61 votes
                    Vote
                    Sign in
                    Check!
                    (thinking…)
                    Reset
                    or sign in with
                    • facebook
                    • google
                      Password icon
                      I agree to the terms of service
                      Signed in as (Sign out)
                      You have left! (?) (thinking…)
                      1 comment  ·  HVAC  ·  Admin →

                      We are considering this for DM HVAC 7.1. Additional information about what you would like the schedule to look like would be helpful, either in the comments or emailed to us.

                      In particular, examples of schedules you currently use would help a lot. I prefer Excel or DWG format over PDF if possible!

                    • Set Room Exhaust Rate

                      Specify the exhaust air requirements for rooms and use these numbers in the load calculations and duct design calculations.

                      51 votes
                      Vote
                      Sign in
                      Check!
                      (thinking…)
                      Reset
                      or sign in with
                      • facebook
                      • google
                        Password icon
                        I agree to the terms of service
                        Signed in as (Sign out)
                        You have left! (?) (thinking…)
                      • Equipment airflow available

                        Set the available CFM for a piece of equipment. If this value changes, update the airflow assigned in the downstream ducts.

                        0 votes
                        Vote
                        Sign in
                        Check!
                        (thinking…)
                        Reset
                        or sign in with
                        • facebook
                        • google
                          Password icon
                          I agree to the terms of service
                          Signed in as (Sign out)
                          You have left! (?) (thinking…)
                        • Duct and pipe demolition

                          Convert existing ductwork and piping layer to demolition.

                          1 vote
                          Vote
                          Sign in
                          Check!
                          (thinking…)
                          Reset
                          or sign in with
                          • facebook
                          • google
                            Password icon
                            I agree to the terms of service
                            Signed in as (Sign out)
                            You have left! (?) (thinking…)
                          • Diversify zone airflow based upon people diversity

                            When a VAV zone has people diversity specified, update the zone airflow. Currently, the zone load is updated, but the airflow is not.

                            0 votes
                            Vote
                            Sign in
                            Check!
                            (thinking…)
                            Reset
                            or sign in with
                            • facebook
                            • google
                              Password icon
                              I agree to the terms of service
                              Signed in as (Sign out)
                              You have left! (?) (thinking…)
                            • Make Grips Work With Diffuser Callouts

                              Fix the diffuser callouts so they can be moved more consistently and reliable with grips instead of using the "Move Callout" command.

                              0 votes
                              Vote
                              Sign in
                              Check!
                              (thinking…)
                              Reset
                              or sign in with
                              • facebook
                              • google
                                Password icon
                                I agree to the terms of service
                                Signed in as (Sign out)
                                You have left! (?) (thinking…)
                              • 24x24 Box Around Diffuser

                                Have an option to insert a 24x24 box around an diffuser for use in RCP's.

                                0 votes
                                Vote
                                Sign in
                                Check!
                                (thinking…)
                                Reset
                                or sign in with
                                • facebook
                                • google
                                  Password icon
                                  I agree to the terms of service
                                  Signed in as (Sign out)
                                  You have left! (?) (thinking…)
                                • Show Locked CFM in Duct Centerline

                                  I have been back into DM after a short break away from it's use. I have found that text now appears along the center line referencing that the width, depth, or shape of the duct has been locked. This is a great new feature. However, I feel that one of the most important features that could be shown as locked is that of the CFM. In a quick duct sizing and CFM check, by locking the CFM of the end duct in the various branch strings, one can size and determine very quickly how a system is going to be.…

                                  0 votes
                                  Vote
                                  Sign in
                                  Check!
                                  (thinking…)
                                  Reset
                                  or sign in with
                                  • facebook
                                  • google
                                    Password icon
                                    I agree to the terms of service
                                    Signed in as (Sign out)
                                    You have left! (?) (thinking…)
                                  • Variable Custom Pressure Drop in Ductwork

                                    Be able to specify a pressure drop in the ductwork that changes based upon the airflow in the ductwork.

                                    We currently allow you to lock a specific pressure drop but it does not change as the design changes. Instead lock an equivalent duct length or something similar that would change based upon the airflow.

                                    0 votes
                                    Vote
                                    Sign in
                                    Check!
                                    (thinking…)
                                    Reset
                                    or sign in with
                                    • facebook
                                    • google
                                      Password icon
                                      I agree to the terms of service
                                      Signed in as (Sign out)
                                      You have left! (?) (thinking…)
                                    1 3 Next →
                                    • Don't see your idea?

                                    Design Master Wish List

                                    Feedback and Knowledge Base