  1. Default label locations in blocks

    Be able to specify locations for labels in blocks. When the labels are added to the block, they will be placed in the desired locations, rather than in the somewhat random default location they are currently placed in.

    9 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Set room boundaries to also be light-obstructing rectangles for photometric analysis

    It duplicates work to trace the boundaries of all rooms for energy analysis and circuit naming, then have to trace all the rooms again for photometric analysis. This would likely require the addition of a 'door' object to define places where light-obstructing boundaries would be ignored

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. Circuiting layer dependent on device layer system

    DM's default circuit layer system can be determined by three different options: (1) same as distribution equipment, (2) new, and (3) existing. We'd like a fourth option that makes the circuit layer system match the circuit layer system of the device that's being circuited.

    For example, we're currently designing a job where we are installing new receptacles that are being fed from an existing panel. Our receptacle circuit callouts are coming up under the existing layer system (based off of the panel) instead of the new layer system (based off of the new receptacles). To address this, we changed the…

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Electrical elevation label

    Create a label that will display the elevation of a device and update automatically when the elevation changes.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Support feeder calcs for track lighting

    See NEC 220.43(B). The connected load for the branch circuit is the sum of the wattage of the connected light fixtures. The demand load is an additional 150VA per foot. I would like a place to enter the number of feet of track on a branch circuit so the demand load is calculated correctly in the load summary. We currently accomplish this through a 'Variable Caclulated Load', but it might be more intuitive if there is a 'Length Variable Demand' option. Thank you.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Minimum panel clearance width

    For panels smaller than 30" width, increase the panel clearance width to 30" automatically.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Homerun Note

    Be able to add a note to a homerun callout.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Add load column to receptacle schedule

    Add a column to the receptacle schedule to show the load on the receptacle.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Double neutral wire size for wires less than 1/0

    When a feeder neutral is doubled, DM simply adds a second neutral wire. NEC 310.10 does not allow this for wires less than 1/0. Update this calculation to correctly resize the wire when appropriate.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Connect loops to fixtures on same switch first

    When inserting automatic loops, connect devices on a switch together first rather than mixing up the loops when multiple switches are on a circuit.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Define fixed load by phase

    When defining fixed load on a panel schedule allow entry of per phase loads on two and three phase circuits in stead of lumped loads, i.e., on 2-pole circuit be able specify a load for phase A and B on any of the demand categories.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. please add a new column to the lighting fixture schedule for "KELVIN"

    ADD NEW COLUMN IN LIGHT FIXTURE SCHEDULE FOR "KELVIN"

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Subfeed Breakers on Panels

    Add a feature to handle subfeed breakers on panels.

    Currently, the workaround is to add additional poles to your panel and use those for the subfeed and mark the ones on the other side as unusable.

    68 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Export Light Fixture Watts to Excel

    Export the Energy Code Settings->Watts field from the light fixture schedule to Excel using the DM Electrical Excel Add-in.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Homerun from non-circuited devices

    We'd like an option to manually homerun from devices that lack a circuit. For example, we frequently connect switched receptacles to relays controlled by occupancy sensors, so we'd like to show our homeruns to start at that relay as opposed to a receptacle. We also currently show lighting homeruns commencing at relays for the same reason.

    We'd still like to be able to select devices whose circuits we want to include in the homerun.

    10 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Voltage Drop in Equipment Schedule

    Add "Voltage Drop" as a column to the equipment schedule. Would list the branch circuit voltage drop to a each piece of equipment in the schedule.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Light Fixture Settings - Different Blocks

    The ability to define an egress fixture as the same fixture/block as the normal fixtures, with an option to turn a hatch on/off to differentiate. Similar to in Revit, where you can set an instance parameter and check it to turn fixtures into the egress blocks. The fixture type stays the same, only the visible block changes.

    27 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  5 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Custom Transformer Impedance and XR Ratio

    Be able to create a custom table of impedance and XR ratio values for transformers based upon the kVA. Currently the default values are fixed. If you always use different values, you have to manually change them every time.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Incorporate adjustable trip breakers

    Add the ability to specify breakers with electronic trip units (ETUs), aka adjustable trip breakers, in Design Master projects.

    The intent of adding this capability would be to allow the user to flag where an ETU is used and display the required/desired settings.

    It would NOT be the intent to make DM have the functionality to do the coordination studies necessary to develop the settings.

    1) Electronic trip breakers, when used, are usually MCBs or feeder breakers with the following characteristics:

    Breaker Frame (AF)
    Breaker trip (AT)
    Breaker plug size (AP)*

    Long-time pickup (LTPU)
    Long-time delay (LTD)
    Short-time pickup (STPU) …

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Fewer Tick Marks and Circuit Labels on Combined Homeruns

    Have an option for combined homeruns that will display tick marks and a circuit callout on the loop where the circuits change.

    For example, if you have a circuit like this:

    <-----(1)------(1)------(3)------(3)

    It would insert a circuit label and tick marks between the devices on circuit 1 and 3.

    P-1,3<-----(1)------(1)---3--(3)------(3)

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →