  1. Calculate General and Egress Photometrics in Same Boundary

    It would be nice if we didn't need to create two photometric calculation areas. It would be great if one calc area could work for both general and egress calcs.

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Demolition Layer Devices

    I do not feel that the schedules should show counts for devices like receptacles and computer outlets that are on a demolition layer.

    10 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. New and Existing Circuits / Breakers in Panel Schedule

    Be able to show new and existing circuits on different layers in a panel schedule. The existing circuits would be on a lighter layer and the new circuits would be on a darker layer. The rest of the schedule could be on either the new or existing layer.

    19 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Loop Feed Transformer

    Add an option to allow loop feeds for transformers.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Tick Marks on Switches in Parallel

    Handle tick marks on switches in parallel correctly.

    One use for this is multiple occupancy sensors in which case if any one switch is on the lights will be one. Each switch requires a hot and neutral as well as the switched leg.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Add DC

    For modeling complete solar systems.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Set number of spare breakers

    Add an option to require a set number of spare breakers on every panel. The other breakers in the panel would be listed as spaces.

    15 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. More customization for equipment callouts

    Add more complicated options for callouts on equipment.

    Add MCA and MOCP as notes on the callout on the drawing.

    See images on this forum post for examples:
    http://forums.designmaster.biz/index.php?showtopic=1817

    If you vote for this, it would be helpful if you could leave a comment letting us know what values you want displayed in the equipment callout.

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Different Layers for New and Existing Items in Schedules

    Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Having the ability to specify a breaker trip setting and plug size.

    Add the ability to specify a breaker trip setting and plug size for adjustable trip breakers.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Total Load in Project

    Please add capability to total loads for the project before the circuiting is complete.

    I would like to have a load sheet that keeps track of the total project load.

    What I use now is a modified panel shedule that only shows the loads for a dummy panel I create called service. I connect all the panels together and then to Service. This gives me a total load analysis for the project, but only after the design is complete. I need to be able to confirm my loads and service sizing at the design development stage before circuiting.

    A consideration…

    21 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. add medium voltage conductors as an option when sizing conduits.

    MV conductor insulation is much larger so you cannot get as many conductors inside a conduit. if you're using design master to calculate your feeder conduits it will be incorrect over 600v. I don't believe this is readily apparent now.

    13 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Export Equipment List to Excel

    Export a list of equipment connections and information to a file that can be opened and viewed in Excel. The file would be for post-processing only. Any changes to the equipment would still be made using the other DM commands.

    53 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. 1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Different layer systems for different loops and tick marks on a circuit

    We can assign layers based on one-line (panel) or circuit or devices however not all parts of circuit are on the same layer. I may run some in the slab and some in the walls. Having the ability toi use the manual loop tool to change the layer system would be helpful. Also having the ability to assign a device to multiple layers would be helpful as well.

    Or have some of the loops new and some existing.

    7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Selected device type to find that are uncircuited

    Often I circuit items by device type, such as equipment first, then general receptacles, and finally lighting. Sometimes I only show the light fixtures or site lighting but don't ever circuit them as a lighting designer is taking that part of the contract. So under either situation if the symbols have already been placed and I do the “Highlight Uncircuited Devices” command, I get so many lines going all over the place that I can't find out which receptacles I haven't circuited. It would be nice under the Highlight Uncircuited Devices label you have a sub-selection of: Receptacle, Lights, Equipment,…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Manufactured Wiring (Modular wiring) NEC 604

    Add wiring and symbols for manufactured wiring systems (NEC 604), MWS, Reloc etc

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. add sub-script option for junction boxes

    Add subscript for junctions boxes like you did for low voltage devices.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Low Voltage Homerun With Keynote

    On low voltage systems drawings (Fire Alarm, Security, CCTV) we treat homeruns differently than power and lighting homeruns. We do not use the circuit label, wire callout, or tick marks, but rather we use a keynote. If there was a “keynote homerun”, it would save us the time spent removing the wire call-out every time we create low voltage homerun.

    9 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  4 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Import single piece of equipment

    Currently, the "Import Equipment from Another Project" command imports all the equipment. Update that function to allow you to choose specific pieces of equipment to import.

    4 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base