The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Voltage Drop Based upon Connected or Other Load

    Be able to specify that the voltage drop on a feeder should be based upon the connected or other load, rather than the calculated load.

    One example of a use for this feature is a piece of equipment that serves a single motor. You want the voltage drop for the connected load of the motor, rather than the calculate load, which will be 125% of the motor load.

    10 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Label homeruns with feeder IDs

    Label homeruns using feeder IDs like those used in the one-line diagram instead of full text wire callouts.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. Reset panel "Fixed Loads".

    Often, I need to "start over" on a panel that I've assigned fixed loads. It would be handy to have a button that would clear every fixed load on the panel. Or even be able to select several circuits and clear those circuit's fixed loads.

    8 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Subfeed breakers

    Add specific support for subfeed breakers.

    Be able to set the number of subfeed breakers on a panel (similar to how the number of poles is currently set on a panel).

    Have the panel schedule update to document which breakers are subfeed. We likely would add a separator block between the branch circuit and subfeed breakers that you could customize. The default block would have a line across the schedule plus some text indicating branch circuit breakers above and subfeed below. You could then modify that as desired for your documentation purposes.

    34 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. On a one-line diagram, a vertical bus panel should have horizontal branch breakers--NOT vertical!

    When you generate a one-line diagram, if you have panels that have a vertical bus, their branch breakers end up at the bottom of the bus and are vertical. The look like main breakers--not branch breakers. A work around for this is for every vertical bus panel, generate a riser diagram starting with that panel. Even this work around is not perfect, as you have to resize the vertical bus and fiddle with the branch breaker.

    7 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Show schedule notes on last column when schedule is split

    Currently if a schedule has a "Maximum Schedule Height" set the schedule notes are placed at the bottom of the first column. It would be better to place them at the bottom of the last column (or at least have an option to place them there) since the last column is often shorter than the others.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Import single piece of equipment

    Currently, the "Import Equipment from Another Project" command imports all the equipment. Update that function to allow you to choose specific pieces of equipment to import.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Equipment Panel Description

    In the Panel Description dropdown, add "Equipment Callout + Description" to the list, in addition to "Same as Equipment Callout" and "Custom".

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Default Groups

    Have the ability to define a default device group name. In multi-phase projects it would be helpful to be able to set a group name as the default instead of having DM go to the "General" group.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Backfeed Breakers

    Be able to use a branch breaker on the panel as the main breaker.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Default label locations in blocks

    Be able to specify locations for labels in blocks. When the labels are added to the block, they will be placed in the desired locations, rather than in the somewhat random default location they are currently placed in.

    9 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. Set room boundaries to also be light-obstructing rectangles for photometric analysis

    It duplicates work to trace the boundaries of all rooms for energy analysis and circuit naming, then have to trace all the rooms again for photometric analysis. This would likely require the addition of a 'door' object to define places where light-obstructing boundaries would be ignored

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Circuiting layer dependent on device layer system

    DM's default circuit layer system can be determined by three different options: (1) same as distribution equipment, (2) new, and (3) existing. We'd like a fourth option that makes the circuit layer system match the circuit layer system of the device that's being circuited.

    For example, we're currently designing a job where we are installing new receptacles that are being fed from an existing panel. Our receptacle circuit callouts are coming up under the existing layer system (based off of the panel) instead of the new layer system (based off of the new receptacles). To address this, we changed the…

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Electrical elevation label

    Create a label that will display the elevation of a device and update automatically when the elevation changes.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Support feeder calcs for track lighting

    See NEC 220.43(B). The connected load for the branch circuit is the sum of the wattage of the connected light fixtures. The demand load is an additional 150VA per foot. I would like a place to enter the number of feet of track on a branch circuit so the demand load is calculated correctly in the load summary. We currently accomplish this through a 'Variable Caclulated Load', but it might be more intuitive if there is a 'Length Variable Demand' option. Thank you.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Homerun Note

    Be able to add a note to a homerun callout.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Add load column to receptacle schedule

    Add a column to the receptacle schedule to show the load on the receptacle.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Double neutral wire size for wires less than 1/0

    When a feeder neutral is doubled, DM simply adds a second neutral wire. NEC 310.10 does not allow this for wires less than 1/0. Update this calculation to correctly resize the wire when appropriate.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Connect loops to fixtures on same switch first

    When inserting automatic loops, connect devices on a switch together first rather than mixing up the loops when multiple switches are on a circuit.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Define fixed load by phase

    When defining fixed load on a panel schedule allow entry of per phase loads on two and three phase circuits in stead of lumped loads, i.e., on 2-pole circuit be able specify a load for phase A and B on any of the demand categories.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base