Design Master Wish List

The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Select automatic conduit based on Type

    When selecting conduit I want to be able to select the feeder as schedule 80 so that the only size option would be based on schedule 80. Then on another feeder I could select EMT for my circuits and the only option for auto sizing would be based on EMT. Finally, I would then have the option of adding the type to my one-lines and a conduit schedule.

    11 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Lighting loads - additional options

    I like the recent addition of the general lighting loads, but there are a couple of additional things that I would like to see related to that.

    1. I think that the calculated load should include the greater of the general lighting load or the connected lighting load. The NEC states that the values for the general lighting loads are minimum values and that they may not be adequate.

    Ok, so this is probably a low priority because the NEC values are pretty conservative. With the increased adoption of energy conservation codes it becomes less likely that the connected lighting…

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. Change Voltage of Project

    Be able to change voltage of a completed project for 208V to 240V and keep everything connected and circuited.

    11 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Export schedules to excel

    My estimators are always asking me if they can get my fixture or panel schedules in an excel format.

    31 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Generator Load Calculations

    Calculate generator loads correctly, mostly by being able to specify that certain loads should not be included in the generator load.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Add "Clear Circuit" Button Back to "Circuiting" Dialog Box

    Add the "Clear Circuit" command back to the "Circuiting" dialog box. This button will set all the breaker and branch circuit sizing options back to "Size Automatically", set all the fixed loads to "0", and set the circuit descriptions to be blank.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. ADD SECURITY SYMBOLS TO LV OPTIONS

    DOOR STRIKE/DOOR CONTACT
    CAMERA
    MOTION SENSOR
    CARD READER
    KEYPAD

    JUST A FEW EXAMPLES...

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Existing Loads & Metered Demand

    Include, in options, the ability to not include existing (layered) items in panel, feeder, and service calculations. I'd like to enter the load to keep track of it, but have the ability to exclude it from the load calculations since "existing" would be included in the metered demand load.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Quick change between tick mark configurations in "Insert Tick Marks" command

    Add some way to quickly change between tick mark configurations in the "Insert Tick Mark" command. Either templates that the user creates, or a set of commonly used configurations.

    If you do vote for this, it would be helpful for you to leave a comment listing most common configuration of tick marks you use.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Equipment Disconnect NEMA Rating

    Add "Disconnect NEMA Size" and "Disconnect NEMA Enclosure" as attributes to equipment connections.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Add a select similar command for devices similar to AutoCAD and AutoCAD MEPs select similar command

    I would like to right click on a device already on the plan, and hit select similar rather than having to open up a separate dialogue to pick a device/LVD/Light Fixture device, and then place it. In other words, I'd like to bypass the select device dialogue altogether whenever possible.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  4 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. Single-phase load on three-phase equipment

    Add a way to include a single-phase load on three-phase equipment. One common use for this is VAV boxes with 3-phase heaters and 1-phase motors, all with a single electrical connection.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Print Full Panel Schedules to 8.5x11 Sheets

    Print full panel schedules, exactly as shown on the drawing, to a printer using 8.5x11 paper.

    One specific use for these panel schedules would be to be submitted to Labor and Industries in Washington state for review.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Convert panel schedules to tables

    Convert panel schedules to use the AutoCAD table feature so they are more customizable.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Provide a button (or perhaps under the Cir Opts button) for quicker selection of "Display tick marks on loops"

    I've given up on loop tickmarks for lighting loops (because of all the energy code relay and occupancy sensor requirements); but I still do tickmarks on power loops. It would be great to be able to more quickly toggle between displaying tickmarks on loops.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Equipment circuit label should be near the equipment symbol--not the equipment label.

    We often turn off printing of equipment label/leader, and use a keynote number with arrow instead. But we have to move the circuit to the equipment symbol, because it ends up under the equipment label (which we are not printing).

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Query Low Voltage Device

    Query command does not show circuit connection for low voltage devices. We typically have low voltage devices connected to different panels, and querying the device to determine the panel to which it is circuited would be nice.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Automatically Add "ON" prefix to homerun labels for which a homerun already exists.

    It is customary for circuits that are shared on opposite ends of a building or from one floor to the next to be identifed with multiple homerun symbols, with all but one of those homeruns labeled with "ON <Panel-Ckt>" rather than connecting with a loop. Currently, to do this, the homerun text itself must be modified, and this rarely works well because that text reverts back to the default <Panel-Ckt> text each time the circuits are updated.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Low-Voltage lighting systems - Transformers and light fixtures for 12 Volt and 24 Volt systems.

    Make possible not only the easy DM insertion of these devices onto the lighting plan but also the ability to account for these in the panel schedule and load calculations.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Add horsepower of individual loads on mcc schedules

    The MCC schedule doesn't have the ability to show horsepower values for the individual loads. This is important information for the MCC vendor for breaker and overload sizing.

    20 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base