Design Master Wish List

The current releases are DM Electrical RT 1.1, DM Electrical 8.4, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.2, DM Electrical 8.5, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Separate hangers on their own layer for BIM modeling.

    Need to print various trades by color for coordination drawings. I think the hangers would be more legible if they could be a different color.

    1 vote
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      I agree to the terms of service
      Signed in as (Sign out)
      You have left! (?) (thinking…)
      0 comments  ·  General  ·  Admin →
    • Import Multiple Items from Master Schedule

      When importing items from the master schedule to the project schedule using the "Import from Master Schedule" button, allow multiple items to be selected and imported at once. (Currently you are limited to importing one item or all of the items.)

      5 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        I agree to the terms of service
        Signed in as (Sign out)
        You have left! (?) (thinking…)
        0 comments  ·  General  ·  Admin →
      • Universal update button

        This button would update all schedules, panels and one lines with one click. Currently going through each schedule option and then during review only finding out you missed one is agonizing. Update drawing and database does NOT do this.

        3 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          I agree to the terms of service
          Signed in as (Sign out)
          You have left! (?) (thinking…)
          0 comments  ·  General  ·  Admin →
        • Set Maximum Schedule Height

          Set a maximum height for schedules. If the schedule exceeds that height, it will continue with the schedule in the space to the right of the schedule.

          11 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            I agree to the terms of service
            Signed in as (Sign out)
            You have left! (?) (thinking…)
            1 comment  ·  General  ·  Admin →
          • 23 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              I agree to the terms of service
              Signed in as (Sign out)
              You have left! (?) (thinking…)
              6 comments  ·  General  ·  Admin →
            • Groups for Light Fixtures, Receptacles, Diffusers, and Other Stuff

              Be able to create different groups for light fixtures, receptacles, and diffusers, similar to equipment and low voltage devices. Have different schedules for each different group.

              Also groups for one-line devices, including panels, switchboards, transformers, and all the other types of devices.

              20 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                I agree to the terms of service
                Signed in as (Sign out)
                You have left! (?) (thinking…)
                7 comments  ·  General  ·  Admin →
              • Copy Room

                Be able to copy a room already inserted on the drawing.

                24 votes
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  I agree to the terms of service
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                  0 comments  ·  General  ·  Admin →
                • Support Revit and Navisworks

                  Provide a way to export the 3D model from Design Master for collision detection with architects using Revit or Navisworks.

                  1 vote
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    I agree to the terms of service
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                    0 comments  ·  General  ·  Admin →
                  • Don't see your idea?

                  Design Master Wish List

                  Feedback and Knowledge Base