The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Automatically Add a "Jog" When a Direct 90-degree Vertical at Wall Would Create an Overlap

    Currently, when a Direct 90-degree Vertical at Wall returns back from the wall on top of the pipe going towards the wall, the pipe on top hides the underneath pipe. A common way of representing this in 2-D models is by adding a "jog" in the pipe. However, in the isometric model the jog doesn't need to appear because overlapping isn't a problem. Automatically showing this "jog" on the 2-D model would make representing these cases much easier.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  2. Dialog Boxes to View and Edit Load Calculation Settings for Entire Building at Once

    Currently to view the ventilation and load schedules the report is run and appears in an html file. If for instance the outside air % is too high I then have to exit the report go back into the rooms with the high percentage and manually overventilate.

    It would be great if there was a screen that combined all of the room information, areas, CFMs, etc. (similar to the load report) but this screen allowed you to manually modify the CFMs, system static pressure, outside air percentage, etc. and by doing this all of the room information is updated at…

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  3. Add DC

    For modeling complete solar systems.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. add medium voltage conductors as an option when sizing conduits.

    MV conductor insulation is much larger so you cannot get as many conductors inside a conduit. if you're using design master to calculate your feeder conduits it will be incorrect over 600v. I don't believe this is readily apparent now.

    13 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Having the ability to specify a breaker trip setting and plug size.

    Add the ability to specify a breaker trip setting and plug size for adjustable trip breakers.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Insert Valves on Vertical Pipes

    Be able to insert valves on vertical pipes. Valves would be displayed on isometric and possibly also on plan view.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  7. Different layer systems for different loops and tick marks on a circuit

    We can assign layers based on one-line (panel) or circuit or devices however not all parts of circuit are on the same layer. I may run some in the slab and some in the walls. Having the ability toi use the manual loop tool to change the layer system would be helpful. Also having the ability to assign a device to multiple layers would be helpful as well.

    Or have some of the loops new and some existing.

    7 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Different Layers for New and Existing Items in Schedules

    Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Importing Revit Model Information

    It would be a great tool if we can have the ability to import model information from Revit drawings which are done by architects. A simple feature would be importing the rooms. This would speed up the process and make designs happen faster.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  10. Low Voltage Homerun With Keynote

    On low voltage systems drawings (Fire Alarm, Security, CCTV) we treat homeruns differently than power and lighting homeruns. We do not use the circuit label, wire callout, or tick marks, but rather we use a keynote. If there was a “keynote homerun”, it would save us the time spent removing the wire call-out every time we create low voltage homerun.

    9 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  4 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Vertical Alignment of Schedules

    Add an option to control the vertical alignment of text in schedule cells.

    Currently everything is justified to the top of the cell. Make it so that text can be centered or at the bottom instead.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  12. Shortcut Keys for DM Commands

    Add shortcut commands for commands. For example, "ML" for "Move Loop or Homerun" or "BC" for "Break Circuit".

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  13. Modify design load calculations and output to accommodate VAV system selection

    Modify design load calculations to more accurately size/select VAV boxes. The revised calculations would take into account the heat required to overcome the additional air supplied to the VAV box that is over and above the minimum required in the heating calculations. This will help since the additional air is typically at 55 degrees and will actually add heat load to the space in addition to that required by the envelope and minimum supply air. In some cases this can be a significant load.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  14. For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for al

    For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for all the fixtures on the posted schedule. That will help expedite the Lighting Power Density calculations required for Energy Code Compliance.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. MULTIPLE ARROWS

    It would be nice to be able to have multiple arrows for 1 piece of text pointing to different devices

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  17. Create training material for the HVAC section.

    The tutorial doesn't get into enough depth or cover everything, specifically the master schedule and project schedules and how they affect the project.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  18. Selected device type to find that are uncircuited

    Often I circuit items by device type, such as equipment first, then general receptacles, and finally lighting. Sometimes I only show the light fixtures or site lighting but don't ever circuit them as a lighting designer is taking that part of the contract. So under either situation if the symbols have already been placed and I do the “Highlight Uncircuited Devices” command, I get so many lines going all over the place that I can't find out which receptacles I haven't circuited. It would be nice under the Highlight Uncircuited Devices label you have a sub-selection of: Receptacle, Lights, Equipment,…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Manufactured Wiring (Modular wiring) NEC 604

    Add wiring and symbols for manufactured wiring systems (NEC 604), MWS, Reloc etc

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. add sub-script option for junction boxes

    Add subscript for junctions boxes like you did for low voltage devices.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
1 2 9 11 13 16 17
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base