The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. MULTIPLE ARROWS

    It would be nice to be able to have multiple arrows for 1 piece of text pointing to different devices

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  3. Create training material for the HVAC section.

    The tutorial doesn't get into enough depth or cover everything, specifically the master schedule and project schedules and how they affect the project.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  4. Selected device type to find that are uncircuited

    Often I circuit items by device type, such as equipment first, then general receptacles, and finally lighting. Sometimes I only show the light fixtures or site lighting but don't ever circuit them as a lighting designer is taking that part of the contract. So under either situation if the symbols have already been placed and I do the “Highlight Uncircuited Devices” command, I get so many lines going all over the place that I can't find out which receptacles I haven't circuited. It would be nice under the Highlight Uncircuited Devices label you have a sub-selection of: Receptacle, Lights, Equipment,…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Manufactured Wiring (Modular wiring) NEC 604

    Add wiring and symbols for manufactured wiring systems (NEC 604), MWS, Reloc etc

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. add sub-script option for junction boxes

    Add subscript for junctions boxes like you did for low voltage devices.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Choose Fittings Used In Pressure Drop Calculations

    Add the ability to choose the specific fitting type used when calculating pressure drop in duct systems. Currently, the fitting type is fixed.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  8. Breaker Using Twice as Many Spaces

    Many breaker panels of old and of new has the ability to put a single, two, or three pole breaker in that takes twice as many spaces as normal. Example is I have a panel I have to represent that has a 2 pole breaker that takes position 36-38 and 40-42. It also has a 3 pole breaker in it that take 24-26,28-30,32-34. I have no way of circuiting the device and still have it on phase A, B, and C.

    8 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Device information on hover

    When you hover (or float) your mouse over a DM device, display information about that device in a tooltip.

    For DM Electrical, possible information would include callout and circuit number

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  1 comment  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  10. When a panel is designated as existing, the circuit descriptions (editable part in the circuiting form) start off with "EX"

    When a panel is designated as existing, the circuit descriptions (editable part in the circuiting form) start off with "EX"

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. please show velocity and PD/100ft

    by showing velocity and PD/100ft on a check layer, engineers could check work and easily scan and review a job for errors.

    8 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  12. Selective Coordination

    Comply with NEC Article 700 requirements for selective coordination of overcurrent protective devices in the supply side of emergency system.

    9 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Add Static Regain that balances duct system correctly

    Current Static Regain calculation does not seem to calc and size ducts to balance system. The static regain should balance the system where the ducts split.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  14. put alternating shading on successive rows in outputted html tables/reports

    For example, when I print an HVAC load calculation report, the many row entries can be difficult to follow visually across the screen. This obviously won't be useful in absolutely every case, but an option to have a little bgcolor="#EEEEEE" every other line would be awesome.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  15. Handle LED Lighting Better

    Calculate the load based upon the length and the remote transformers.

    15 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. 10 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  1 comment  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  17. Use Branch Circuit as Main Breaker for Panel

    need a way for a branch breaker to serve as the main in a panelboard and allow it to connect on the oneline

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Find Unlooped Devices

    A function similar to “Find Uncircuited” that finds elements that are circuited but have not been looped – “Find Unlooped” or something of that nature. I often am at risk of missing a dedicated receptacle or single equipment connection that I circuited, but missed when I was going through the looping/home run process.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Error Checking

    Provide a simple error checking routine that will look at panel loads and compare them to wire sizes and ratings of upstream breakers. This could be a simple table like voltage drop and fault currents where out of range values are shown in a different font type.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Same equipment in multiple drawings or areas

    Right now I can put one-line devices on multiple drawings, but not equipment. Sometimes the equipment is so large such as a chiller that it needs to be seen on the site drawing at a different scale than the electrical plan view.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
1 2 9 11 13 16 17
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base