The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Multiple Switch Legs on a Single Switch

    Allow a single switch to have multiple switch legs associated with it. Currently we require a separate switch for each switch leg.

    26 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. 2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  3. Remember Zone Tree Settings

    Remember which zones are opened and closed in the zone tree dialog box when you open and close it.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  4. Define data base location in directory other than project directory.

    Give us the ability to specify directory location for the project data base rather than being forced to have the data base in the project directory. In a multi-tenant project if each tenant space is in a separate sub-directory you have to copy the building master data base to each sub-directory in order to work on that space. It is difficult to keep track of which tenant space has the most up to date project data base. In an earlier version of Designmaster, we had the ability to look for the data base in a directory above the specific project…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  5. More MCC Stater Sizes

    Is it possible to modify the list of standard starter sizes to include VFD, Soft Switch, etc? Or even to choose 'None' and just type it in the Description field?

    I've used the ddedit command on the MCC schedule inserted into the drawing to manually modify it, but if anybody does a coordination this will be lost.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Minimum panel clearance width

    For panels smaller than 30" width, increase the panel clearance width to 30" automatically.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Variable Pressure Drop for Diffusers

    Using the maximum scheduled pressure drop for every scenario over inflates the pressure calcs. This is very important for low-pressure systems with low static terminal units such as ducted VRF and Fan Coil Units that max out at .25". Using the maximum scheduled pressure drop of say, .1" for air devices make it difficult to design low static systems accurately.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  8. The ability to easily copy all pipes including risers to other drawings.

    Would be great to be able to copy all piping, including risers to other drawings. Even if you had the option to change risers to pipe I think it would be helpful and save time from having to chase down and draw all the risers a second time.

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  9. Premade fixture blocks

    Premade blocks similar to what is used in both HVAC and Electrical could be inserted into the drawing with predefined fixture units. The fixture units would be stored into multiple headings with IPC and UPC fixture units. The connections would be there with predetermined heights as well.

    26 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  10. lighting report

    Provide a check box in the Building Room dialog box to NOT include the room in the lighting report.

    I have a job where I need room names to generate the names for the receptacle circuits in the panel schedule, but don't want the rooms to show up in the Indoor Lighting Levels report.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Equipment and Receptacle Short Circuit Calculations

    Add the ability to select a checkbox for receptacles and equipment so that short circuit calculations are included for that device.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. 31 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  13. Add Sections to Panels

    Define how many breakers are in each section of panel. This would be used when creating a 84 circuit panel that is made up of 2 sections, each with 42 circuits.

    For the panel schedule, include a separator between the sections.

    When circuiting, do not allow 2 or 3 pole circuits to span the two sections.

    22 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Highlight Duct Sizes That Changed After Resizing Ductwork

    For large sprawling duct systems it is difficult to monitor all the duct sizes that change. When you calculate and redraw a single branch, all the ducts are erased and redrawn. This makes it difficult to know which duct sizes changed and which stayed the same.

    18 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  15. Provide Minumum air flow calculations

    If the minimum air flow is set in the calculation bases on a parameter such as air change rate, cfm/sq ft or a set cfm it would be nice to have that as a column in the calculation output.

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  16. 8 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Plumbing  ·  Flag idea as inappropriate…  ·  Admin →
  17. More options for panel callouts, circuit labels, and homerun callouts

    Add the ability to specify a prefix or suffix for panel callouts when inserting them on the drawing. For example, be able to label them NEW PANEL 'LA' rather than simple LA.

    Also be able to replace the panel name with a different value in the circuit callout. This feature would be used when the panel name is very long.

    Also be able to leave the panel name off entirely and list just the circuit number in the homerun label. This feature would be used when there is only one panel in an area.

    12 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Remember Location of Dialog Boxes

    When a dialog box is moved, remember the location so that the next time it is opened, it is displayed in the same location.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  19. Add an option to the "Duct: Edit Multiple" dialog that allows users to choose whether to preserve duct endpoint connections or not.

    So if I query and individual duct section and change the elevation of either end, the ducts the ends are connected to also change elevation to preserve the connection between the endpoints. If I "edit multiple" on several duct sections and change the endpoint elevations, the other duct sections connected at those points do not change elevation to preserve the connection. Sometimes, changing the elevation of one endpoint without keeping any other endpoints attached is what I want, and sometimes I wish the connections were all preserved. I think there should be a drop-down, a radio button, or something on…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  20. Export the luminaire schedule into excel

    I have lighting reps ask me all the time for an excel spreadsheet of our luminaire schedule. It would be helpful to export our luminaire schedule into excel.

    14 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →