Design Master Wish List

The current releases are DM Electrical RT 1.1, DM Electrical 8.4, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.2, DM Electrical 8.5, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Photometric calculation schedule

    I would like to suggest that the photometric calculation schedule be a combined schedule for all rooms instead of a dedicated schedule for each single room/space (or both options be available). We are typically asked to provide a single schedule that lists the room/space name in the first column and then the various footcandle columns.

    4 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      I agree to the terms of service
      Signed in as (Sign out)
      You have left! (?) (thinking…)
    • A spreadsheet like table, simular to the fault calculations, that shows all the load calculation fields by panel, as they move to the final

      A spreadsheet like table, similar to the fault calculations, that shows all the load calculation categories by panel, as they move to the final service calculation. We could then turn the load calculation footer off on the panel schedules and include this summary table in the drawings. It would also be great to figure out how the loads are adding up.

      6 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        I agree to the terms of service
        Signed in as (Sign out)
        You have left! (?) (thinking…)
      • Insert Devices via command line

        Be able to insert a receptacle/device without picking it from the 'Insert Receptacle' form. A command followed by the device name would prompt the user to place the receptacle like they just clicked "OK" after selecting a device.

        4 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          I agree to the terms of service
          Signed in as (Sign out)
          You have left! (?) (thinking…)
        • Multi text search

          implement Multi-Text search through out the menus.

          So for example when searching through the Insert Receptacle menu and in my case we have several thousand pieces of equipment. if the equipment is called 'RX99S' instead of just allowing us to hit 'R' and starting us off at the beginning of the list of 'R' equipment allow us to type out 'RX99S' and design master go straight to the piece of equipment. this is a very simple change to the code in design master and would save tons of time on projects.

          20 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            I agree to the terms of service
            Signed in as (Sign out)
            You have left! (?) (thinking…)
          • Lighting loads - additional options

            I like the recent addition of the general lighting loads, but there are a couple of additional things that I would like to see related to that.

            1. I think that the calculated load should include the greater of the general lighting load or the connected lighting load. The NEC states that the values for the general lighting loads are minimum values and that they may not be adequate.

            Ok, so this is probably a low priority because the NEC values are pretty conservative. With the increased adoption of energy conservation codes it becomes less likely that the connected lighting…

            6 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              I agree to the terms of service
              Signed in as (Sign out)
              You have left! (?) (thinking…)
            • Change Voltage of Project

              Be able to change voltage of a completed project for 208V to 240V and keep everything connected and circuited.

              11 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                I agree to the terms of service
                Signed in as (Sign out)
                You have left! (?) (thinking…)
              • Actual Tonnage for HVAC Equipment

                Add an option to specify the actual tonnage for HVAC equipment in the zone dialog. Use this value to display actual CFM / ton and other values.

                2 votes
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  I agree to the terms of service
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                • Export schedules to excel

                  My estimators are always asking me if they can get my fixture or panel schedules in an excel format.

                  27 votes
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    I agree to the terms of service
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                  • Add "Clear Circuit" Button Back to "Circuiting" Dialog Box

                    Add the "Clear Circuit" command back to the "Circuiting" dialog box. This button will set all the breaker and branch circuit sizing options back to "Size Automatically", set all the fixed loads to "0", and set the circuit descriptions to be blank.

                    3 votes
                    Vote
                    Sign in
                    Check!
                    (thinking…)
                    Reset
                    or sign in with
                    • facebook
                    • google
                      Password icon
                      I agree to the terms of service
                      Signed in as (Sign out)
                      You have left! (?) (thinking…)
                    • ADD SECURITY SYMBOLS TO LV OPTIONS

                      DOOR STRIKE/DOOR CONTACT
                      CAMERA
                      MOTION SENSOR
                      CARD READER
                      KEYPAD

                      JUST A FEW EXAMPLES...

                      3 votes
                      Vote
                      Sign in
                      Check!
                      (thinking…)
                      Reset
                      or sign in with
                      • facebook
                      • google
                        Password icon
                        I agree to the terms of service
                        Signed in as (Sign out)
                        You have left! (?) (thinking…)
                      • Duct Continuation

                        There may already be an option (please inform me as I am not aware) for a 'duct continuation symbol/fitting'. Currently I have to go back and Pline a goofy looking thing to indicate continuations in the ductwork. Any thoughts?

                        6 votes
                        Vote
                        Sign in
                        Check!
                        (thinking…)
                        Reset
                        or sign in with
                        • facebook
                        • google
                          Password icon
                          I agree to the terms of service
                          Signed in as (Sign out)
                          You have left! (?) (thinking…)
                        • Generator Load Calculations

                          Calculate generator loads correctly, mostly by being able to specify that certain loads should not be included in the generator load.

                          1 vote
                          Vote
                          Sign in
                          Check!
                          (thinking…)
                          Reset
                          or sign in with
                          • facebook
                          • google
                            Password icon
                            I agree to the terms of service
                            Signed in as (Sign out)
                            You have left! (?) (thinking…)
                          • Existing Loads & Metered Demand

                            Include, in options, the ability to not include existing (layered) items in panel, feeder, and service calculations. I'd like to enter the load to keep track of it, but have the ability to exclude it from the load calculations since "existing" would be included in the metered demand load.

                            1 vote
                            Vote
                            Sign in
                            Check!
                            (thinking…)
                            Reset
                            or sign in with
                            • facebook
                            • google
                              Password icon
                              I agree to the terms of service
                              Signed in as (Sign out)
                              You have left! (?) (thinking…)
                            • Luminaire energy code settings should default to "input VA" for Watts & "schedule descrip." for description

                              This would save two extra input steps in most cases. You could still click into the box to edit the Watts and Description.

                              1 vote
                              Vote
                              Sign in
                              Check!
                              (thinking…)
                              Reset
                              or sign in with
                              • facebook
                              • google
                                Password icon
                                I agree to the terms of service
                                Signed in as (Sign out)
                                You have left! (?) (thinking…)
                              • DESIGN MASTER ELECTRICAL when wiring using the looping option

                                When wiring I have more often than not had to manually loop my devices for a better looking presentation but the only problem is that the wires loose their intelligence and become as regular polylines. I would like to see an intelligent manual line which auto breaks and shows the tick marks just like the auto looping feature does please.

                                4 votes
                                Vote
                                Sign in
                                Check!
                                (thinking…)
                                Reset
                                or sign in with
                                • facebook
                                • google
                                  Password icon
                                  I agree to the terms of service
                                  Signed in as (Sign out)
                                  You have left! (?) (thinking…)
                                • Edit Fixture Units in "Edit Multiple Pipes" Command

                                  The Edit Multiple Pipes command needs to have the ability to change fixture units. Sometimes I forget to add fixture units to hot and cold water pipes I'm copying to other sink or shower locations and then I have to change each one individually or erase them and copy them again after I've added fixtures units to the first one to be copied. The current project I'm working on is a large university sports complex with a lot of locker rooms so you can imagine the number of showers, sinks and toilets, etc.

                                  2 votes
                                  Vote
                                  Sign in
                                  Check!
                                  (thinking…)
                                  Reset
                                  or sign in with
                                  • facebook
                                  • google
                                    Password icon
                                    I agree to the terms of service
                                    Signed in as (Sign out)
                                    You have left! (?) (thinking…)
                                  • Quick change between tick mark configurations in "Insert Tick Marks" command

                                    Add some way to quickly change between tick mark configurations in the "Insert Tick Mark" command. Either templates that the user creates, or a set of commonly used configurations.

                                    If you do vote for this, it would be helpful for you to leave a comment listing most common configuration of tick marks you use.

                                    0 votes
                                    Vote
                                    Sign in
                                    Check!
                                    (thinking…)
                                    Reset
                                    or sign in with
                                    • facebook
                                    • google
                                      Password icon
                                      I agree to the terms of service
                                      Signed in as (Sign out)
                                      You have left! (?) (thinking…)
                                    • Dash in Empty Schedule Cells

                                      Include an option to print a "-" (a dash) in schedule cells if nothing is printed in them.

                                      2 votes
                                      Vote
                                      Sign in
                                      Check!
                                      (thinking…)
                                      Reset
                                      or sign in with
                                      • facebook
                                      • google
                                        Password icon
                                        I agree to the terms of service
                                        Signed in as (Sign out)
                                        You have left! (?) (thinking…)
                                      • Device Circuiting - More options than just a loop.

                                        We do a lot of low voltage design, and when we circuit on the drawings, the only option for circuiting is a loop. With multiple low voltage systems on one drawing (door locks, intercoms, CCTV, access control, RFID, duress alarms, paging, etc.), looped circuiting looks messy and can be confusing. It would be nice to have other types of circuiting available that is more linear.

                                        4 votes
                                        Vote
                                        Sign in
                                        Check!
                                        (thinking…)
                                        Reset
                                        or sign in with
                                        • facebook
                                        • google
                                          Password icon
                                          I agree to the terms of service
                                          Signed in as (Sign out)
                                          You have left! (?) (thinking…)
                                        • Add capability to have separate two line callouts for supply and return diffusers.

                                          Add capability to have custom two line callouts for supply, return and exhaust diffusers as there is currently for one line callouts. Allow the second line to be blank for the return callout as there is often no need for cfm on the return callout. Same as a two line callout for supply diffusers and one line for return grilles.

                                          1 vote
                                          Vote
                                          Sign in
                                          Check!
                                          (thinking…)
                                          Reset
                                          or sign in with
                                          • facebook
                                          • google
                                            Password icon
                                            I agree to the terms of service
                                            Signed in as (Sign out)
                                            You have left! (?) (thinking…)
                                          • Don't see your idea?

                                          Design Master Wish List

                                          Feedback and Knowledge Base