Design Master Wish List

The current releases are DM Electrical RT 1.1, DM Electrical 8.4, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.2, DM Electrical 8.5, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Add command to match diffuser callout and location; just like you have for light fixtures.

    It would be nice to at least have the command to match diffuser callout location.

    9 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      You have left! (?) (thinking…)
    • More customization for equipment callouts

      Add more complicated options for callouts on equipment.

      Add MCA and MOCP as notes on the callout on the drawing.

      See images on this forum post for examples:
      http://forums.designmaster.biz/index.php?showtopic=1817

      If you vote for this, it would be helpful if you could leave a comment letting us know what values you want displayed in the equipment callout.

      6 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        Signed in as (Sign out)
        You have left! (?) (thinking…)
      • Different Layers for New and Existing Items in Schedules

        Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

        3 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          Signed in as (Sign out)
          You have left! (?) (thinking…)
        • Total Load in Project

          Please add capability to total loads for the project before the circuiting is complete.

          I would like to have a load sheet that keeps track of the total project load.

          What I use now is a modified panel shedule that only shows the loads for a dummy panel I create called service. I connect all the panels together and then to Service. This gives me a total load analysis for the project, but only after the design is complete. I need to be able to confirm my loads and service sizing at the design development stage before circuiting.

          A consideration…

          20 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            Signed in as (Sign out)
            You have left! (?) (thinking…)
          • Vertical Alignment of Schedules

            Add an option to control the vertical alignment of text in schedule cells.

            Currently everything is justified to the top of the cell. Make it so that text can be centered or at the bottom instead.

            3 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              Signed in as (Sign out)
              You have left! (?) (thinking…)
            • Export Equipment List to Excel

              Export a list of equipment connections and information to a file that can be opened and viewed in Excel. The file would be for post-processing only. Any changes to the equipment would still be made using the other DM commands.

              51 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                Signed in as (Sign out)
                You have left! (?) (thinking…)
              • Selected device type to find that are uncircuited

                Often I circuit items by device type, such as equipment first, then general receptacles, and finally lighting. Sometimes I only show the light fixtures or site lighting but don't ever circuit them as a lighting designer is taking that part of the contract. So under either situation if the symbols have already been placed and I do the “Highlight Uncircuited Devices” command, I get so many lines going all over the place that I can't find out which receptacles I haven't circuited. It would be nice under the Highlight Uncircuited Devices label you have a sub-selection of: Receptacle, Lights, Equipment,…

                1 vote
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                • MULTIPLE ARROWS

                  It would be nice to be able to have multiple arrows for 1 piece of text pointing to different devices

                  3 votes
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                  • Import single piece of equipment

                    Currently, the "Import Equipment from Another Project" command imports all the equipment. Update that function to allow you to choose specific pieces of equipment to import.

                    3 votes
                    Vote
                    Sign in
                    Check!
                    (thinking…)
                    Reset
                    or sign in with
                    • facebook
                    • google
                      Password icon
                      Signed in as (Sign out)
                      You have left! (?) (thinking…)
                    • When inserting circuited equipment on a drawing, do not insert a homerun

                      When inserting a piece of equipment on a drawing that is connected to a circuit, the homerun is inserted, too. Add a checkbox to the insert equipment dialog box to allow you to insert the equipment with a circuit label but no homerun.

                      0 votes
                      Vote
                      Sign in
                      Check!
                      (thinking…)
                      Reset
                      or sign in with
                      • facebook
                      • google
                        Password icon
                        Signed in as (Sign out)
                        You have left! (?) (thinking…)
                      • put alternating shading on successive rows in outputted html tables/reports

                        For example, when I print an HVAC load calculation report, the many row entries can be difficult to follow visually across the screen. This obviously won't be useful in absolutely every case, but an option to have a little bgcolor="#EEEEEE" every other line would be awesome.

                        1 vote
                        Vote
                        Sign in
                        Check!
                        (thinking…)
                        Reset
                        or sign in with
                        • facebook
                        • google
                          Password icon
                          Signed in as (Sign out)
                          You have left! (?) (thinking…)
                        • Find Unlooped Devices

                          A function similar to “Find Uncircuited” that finds elements that are circuited but have not been looped – “Find Unlooped” or something of that nature. I often am at risk of missing a dedicated receptacle or single equipment connection that I circuited, but missed when I was going through the looping/home run process.

                          1 vote
                          Vote
                          Sign in
                          Check!
                          (thinking…)
                          Reset
                          or sign in with
                          • facebook
                          • google
                            Password icon
                            Signed in as (Sign out)
                            You have left! (?) (thinking…)
                          • More MCC Stater Sizes

                            Is it possible to modify the list of standard starter sizes to include VFD, Soft Switch, etc? Or even to choose 'None' and just type it in the Description field?

                            I've used the ddedit command on the MCC schedule inserted into the drawing to manually modify it, but if anybody does a coordination this will be lost.

                            3 votes
                            Vote
                            Sign in
                            Check!
                            (thinking…)
                            Reset
                            or sign in with
                            • facebook
                            • google
                              Password icon
                              Signed in as (Sign out)
                              You have left! (?) (thinking…)
                            • 0 votes
                              Vote
                              Sign in
                              Check!
                              (thinking…)
                              Reset
                              or sign in with
                              • facebook
                              • google
                                Password icon
                                Signed in as (Sign out)
                                You have left! (?) (thinking…)
                              • Minimum panel clearance width

                                For panels smaller than 30" width, increase the panel clearance width to 30" automatically.

                                1 vote
                                Vote
                                Sign in
                                Check!
                                (thinking…)
                                Reset
                                or sign in with
                                • facebook
                                • google
                                  Password icon
                                  Signed in as (Sign out)
                                  You have left! (?) (thinking…)
                                • 0 votes
                                  Vote
                                  Sign in
                                  Check!
                                  (thinking…)
                                  Reset
                                  or sign in with
                                  • facebook
                                  • google
                                    Password icon
                                    Signed in as (Sign out)
                                    You have left! (?) (thinking…)
                                  • lighting report

                                    Provide a check box in the Building Room dialog box to NOT include the room in the lighting report.

                                    I have a job where I need room names to generate the names for the receptacle circuits in the panel schedule, but don't want the rooms to show up in the Indoor Lighting Levels report.

                                    1 vote
                                    Vote
                                    Sign in
                                    Check!
                                    (thinking…)
                                    Reset
                                    or sign in with
                                    • facebook
                                    • google
                                      Password icon
                                      Signed in as (Sign out)
                                      You have left! (?) (thinking…)
                                    • Provide Minumum air flow calculations

                                      If the minimum air flow is set in the calculation bases on a parameter such as air change rate, cfm/sq ft or a set cfm it would be nice to have that as a column in the calculation output.

                                      5 votes
                                      Vote
                                      Sign in
                                      Check!
                                      (thinking…)
                                      Reset
                                      or sign in with
                                      • facebook
                                      • google
                                        Password icon
                                        Signed in as (Sign out)
                                        You have left! (?) (thinking…)
                                      • Highlight Duct Sizes That Changed After Resizing Ductwork

                                        For large sprawling duct systems it is difficult to monitor all the duct sizes that change. When you calculate and redraw a single branch, all the ducts are erased and redrawn. This makes it difficult to know which duct sizes changed and which stayed the same.

                                        18 votes
                                        Vote
                                        Sign in
                                        Check!
                                        (thinking…)
                                        Reset
                                        or sign in with
                                        • facebook
                                        • google
                                          Password icon
                                          Signed in as (Sign out)
                                          You have left! (?) (thinking…)
                                        • Add More Fields for Panel, Transformer, and Other One-Line Device Lists

                                          Add more fields, such as NEMA rating, and general schedule notes, for lists of one-line devices.

                                          0 votes
                                          Vote
                                          Sign in
                                          Check!
                                          (thinking…)
                                          Reset
                                          or sign in with
                                          • facebook
                                          • google
                                            Password icon
                                            Signed in as (Sign out)
                                            You have left! (?) (thinking…)
                                          • Don't see your idea?

                                          Design Master Wish List

                                          Feedback and Knowledge Base