Design Master Wish List

The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Vertical Alignment of Schedules

    Add an option to control the vertical alignment of text in schedule cells.

    Currently everything is justified to the top of the cell. Make it so that text can be centered or at the bottom instead.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  2. Change default "max depth" setting for ductwork

    Add an option for the default "max depth" value that is used when you insert a new duct. Currently it always starts at 24 and you have to remember to change it if you want something different.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  3. 'Capped Ductwork for Future Use' command

    This is similar to the 'end cap' command, but would draw a 'capped for future use' symbol on the end of a duct branch.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  4. Default Groups

    Have the ability to define a default device group name. In multi-phase projects it would be helpful to be able to set a group name as the default instead of having DM go to the "General" group.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Different Layers for New and Existing Items in Schedules

    Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. ADD SECURITY SYMBOLS TO LV OPTIONS

    DOOR STRIKE/DOOR CONTACT
    CAMERA
    MOTION SENSOR
    CARD READER
    KEYPAD

    JUST A FEW EXAMPLES...

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Spaces in Feeder Callouts

    Be able to display feeder callouts with spaces after commas, instead of having all the wire sizes right next to each other.

    Current Callout:
    2''C,2#3/0,#3/0N,#6G

    Desired Callout:
    2''C, 2#3/0, #3/0N, #6G

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Room Names in Circuit Description

    Provide an option for Room Names analogous to the "Conduit location" Option. Also consider other customization:

    -Custom Room prefix - e.g. RM
    -Option to include/exclude Name - e.g., RM 120
    -Option to include/exclude Number - e.g., RM FIRE RISER

    Room Names Location:
    ->Start of Circuit Description
    ->End of Circuit Description

    Currently the room names always go at the end, just like OOTB Revit. Having the option to put the room at the start would allow for better scheduling for when the intent is for circuits to be organized by room, like so:
    https://i.postimg.cc/qMFD3DLx/2019-01-30-13-12-16-Window.png

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical RT  ·  Flag idea as inappropriate…  ·  Admin →
  9. Voltage Drop in Equipment Schedule

    Add "Voltage Drop" as a column to the equipment schedule. Would list the branch circuit voltage drop to a each piece of equipment in the schedule.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Add load column to receptacle schedule

    Add a column to the receptacle schedule to show the load on the receptacle.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Display Equipment Disconnect Ratings on Drawing

    Display the rating of the disconnect and the rating of the fused on the drawing adjacent to the disconnect symbol.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. Command to Automatically Turn Photometric Layers On and Off

    It would be nice to have ribbon menu icon commands to turn the photometric layers on and off as well as automatically turn the respective layer back on after doing a recalc of either general or egress lighting.

    2 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Find Unlooped Devices

    A function similar to “Find Uncircuited” that finds elements that are circuited but have not been looped – “Find Unlooped” or something of that nature. I often am at risk of missing a dedicated receptacle or single equipment connection that I circuited, but missed when I was going through the looping/home run process.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Rotate Equipment ID Tags

    Presently the equipment ID tag reverts to "world" orientation whenever it is moved or when you coordinate data base. Please make it subject to rotate text command, such that it stays in the orientation selected.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Include "1" before single ground and neutral wires

    Add an option to include a "1" in the wire callout before single ground and neutral wires. Currently the wire size is listed with no count before it.

    Current wire callout:
    1/2"C, 1#12, #12N, #12G

    New wire callout:
    1/2"C, 1#12, 1#12N, 1#12G

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical RT  ·  Flag idea as inappropriate…  ·  Admin →
  16. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  17. Export Light Fixture Watts to Excel

    Export the Energy Code Settings->Watts field from the light fixture schedule to Excel using the DM Electrical Excel Add-in.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Use commas or spaces to separate voltage, #poles, #wires ect for equipment callouts

    Currently information on the equipment call out is all grouped together without separation. We have had this requested several times by our clients who would like this changed on our drawings. To currently meet this request we are spending to much time adjusting these individually.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Custom Transformer Impedance and XR Ratio

    Be able to create a custom table of impedance and XR ratio values for transformers based upon the kVA. Currently the default values are fixed. If you always use different values, you have to manually change them every time.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Minimum panel clearance width

    For panels smaller than 30" width, increase the panel clearance width to 30" automatically.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Feedback and Knowledge Base