Design Master Wish List

The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Equipment Disconnect Highlight Blocks

    Support highlight blocks for equipment disconnects. (Highlights are the blocks that allow you to use a second color in blocks.)

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. 0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. IMC Ventilation Schedule

    Create a ventilation schedule that corresponds to what is required by the IMC.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  4. Show Locked CFM in Duct Centerline

    I have been back into DM after a short break away from it's use. I have found that text now appears along the center line referencing that the width, depth, or shape of the duct has been locked. This is a great new feature. However, I feel that one of the most important features that could be shown as locked is that of the CFM. In a quick duct sizing and CFM check, by locking the CFM of the end duct in the various branch strings, one can size and determine very quickly how a system is going to be.…

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  5. Copy equipment connections in equipment group

    When you copy an equipment group, copy all of the equipment connections in it, too. (Currently the group is copied and the group settings, but not the actual pieces of equipment in the group.)

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Different Layers for Schedule Headers

    Be able to set a different layer for the schedule header and subheaders.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  7. Break Loop Between Equipment and Disconnect

    Be able to break the loop going from an equipment connection to a disconnect.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Layer Control Commands for Photometrics

    It would be nice if you could add layer control commands for the associated photometric calculation layers (both general and egress) to turn them on and off like you have for room layers and duct centerlines. The boundaries, foot candles and contours can really clutter up the drawing. Also make it so that when you need to run a general or egress calculation the respective layers will turn back on automatically.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Variable Custom Pressure Drop in Ductwork

    Be able to specify a pressure drop in the ductwork that changes based upon the airflow in the ductwork.

    We currently allow you to lock a specific pressure drop but it does not change as the design changes. Instead lock an equivalent duct length or something similar that would change based upon the airflow.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  10. Automatically add Diffuser Arrows for 1W, 2W, 3W & 4W

    In the diffuser definition dialog box, designate whether it is a 1W, 2W, 3W or 4W diffuser, then attach that number of arrows. When placing the diffuser, allow the user to rotate the diffuser to align the appropriate air flow direction.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  HVAC  ·  Flag idea as inappropriate…  ·  Admin →
  11. Customize Label for Neutral and Ground in Feeder Callout

    Be able to customize the "N" and "G" label in feeder callouts to different text. Likely you would change it to "NEUTRAL" and "GROUND", but give you the option to choose whatever you would like.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
1 2 3 5 Next →
  • Don't see your idea?

Design Master Wish List

Feedback and Knowledge Base