How can we improve Design Master?

Before & After Model

Develop a simple way to build and manage a "before" and "after" model of an electrical distribution system for renovation and build-out projects.

3 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Tim Linenbrink shared this idea  ·   ·  Admin →

    1 comment

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...
      • John Kitsalis, PE commented  · 

        We can do this now by using "Existing" and "New" layers for equipment on the oneline.

      Feedback and Knowledge Base