How can we improve Design Master?

Separate level for motors and equipment rather than the same as receptacles

At times there is not enough room on the particular view to have both receptacles and the AC equipment. I have started changing the equipment to new "Equip" layer.

1 vote
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Richard D shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base