How can we improve Design Master?

Different Layers for New and Existing Items in Schedules

Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

3 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    AdminDavid Robison (President, Design Master Software) shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base