How can we improve Design Master?

Apply demand factors to loads by phase on panels

NEC demand factors currently are calculated for the whole panel, not for each individual phase. It is possible to load one phase with a load type that has a demand factor (such as a kitchen load) and the other phases with load types that do not (such as continuous). The total load on the panel should account for these differences in demand factors by phase.

6 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    AdminDavid Robison (President, Design Master Software) shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base