How can we improve Design Master?

Existing Loads & Metered Demand

Include, in options, the ability to not include existing (layered) items in panel, feeder, and service calculations. I'd like to enter the load to keep track of it, but have the ability to exclude it from the load calculations since "existing" would be included in the metered demand load.

1 vote
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    Dana Lund shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

    0 comments