How can we improve Design Master?

Existing Loads & Metered Demand

Include, in options, the ability to not include existing (layered) items in panel, feeder, and service calculations. I'd like to enter the load to keep track of it, but have the ability to exclude it from the load calculations since "existing" would be included in the metered demand load.

1 vote
Vote
Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
You have left! (?) (thinking…)
Dana Lund shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

0 comments

Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base