How can we improve Design Master?

Locate and edit schedules within groups to create T.I. voltage drop and other schedules that don't include the entire project.

When there is T.I. work within a large project you want to show only the the voltage drop for the TI space. You have to deselect all the equipment not in the space one at a time to show a voltage drop schedule for just the TI work. What if you could group the panels in a similar way to luminaires so that the TI voltage drop or fault schedule has only the TI panels, without disabling the ability to show a schedule for the main project or another TI within that project.

3 votes
Vote
Sign in
Check!
(thinking…)
Reset
or sign in with
  • facebook
  • google
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    J DuBois shared this idea  ·   ·  Admin →

    0 comments

    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      Submitting...

      Feedback and Knowledge Base