The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. A spreadsheet like table, simular to the fault calculations, that shows all the load calculation fields by panel, as they move to the final

    A spreadsheet like table, similar to the fault calculations, that shows all the load calculation categories by panel, as they move to the final service calculation. We could then turn the load calculation footer off on the panel schedules and include this summary table in the drawings. It would also be great to figure out how the loads are adding up.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Apply demand factors to loads by phase on panels

    NEC demand factors currently are calculated for the whole panel, not for each individual phase. It is possible to load one phase with a load type that has a demand factor (such as a kitchen load) and the other phases with load types that do not (such as continuous). The total load on the panel should account for these differences in demand factors by phase.

    6 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. Edit Multiple Types of Devices

    Create an "Edit Multiple" command to works on all types of devices. Include only attributes that are common to all types of devices: layer system, elevation.

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Simpler way to Change fonts in all your panel/switch box schedules

    Right now, one has to edit all the blocks of a panel schedule in order to simply change the font. There should be a way to set the preferred font for all these schedules. If there is a way, I don't know about it. When I first set up DM 10 years or so ago, I do not remember having to change every block, but it's been so long ago...

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. Show conduit runs with schedules

    Be able to show conduits feeder runs on their own layer with up and down riser symbols. Then be able to create a conduit schedule.

    5 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. Equipment Circuit Length in Schedule

    Add new column to the equipment schedule that would display the length of the branch circuit.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Circuit and Move Note in one step

    Often when circuiting I find the location DM puts the label is very poor. It would be nice if after inserting the circuit I could move the circuit text without having to stop the circuiting action, move the text, then start the circuiting action again.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Add a hatch pattern to room definitions

    When defining rooms, it is often difficult to determine which rooms have been defined and which have not, if an area gets surrounded. Adding a hatch pattern on its own layer would make it much easier to determine if you've included all room definition areas.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Label homeruns with feeder IDs

    Label homeruns using feeder IDs like those used in the one-line diagram instead of full text wire callouts.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Low-Voltage lighting systems - Transformers and light fixtures for 12 Volt and 24 Volt systems.

    Make possible not only the easy DM insertion of these devices onto the lighting plan but also the ability to account for these in the panel schedule and load calculations.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Copy and Increment Across Drawings

    Improve the "Copy and Increment" command to work across drawings. Make it easier to move everything from one panel to a different panel on the copied devices.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  3 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. Provide a default voltage for the panels in a project.

    Add a check box to set the voltage for a building. If a building is 120/240, then checking a box will set the default for panels, equipment, etc to 120/240v instead of 120/2083p4w.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Separate column in the feeder schedule for the service grounding electrode conductor.

    The service ground does not get installed in the conduit with the service entrance conductors, so why is it shown just like all the other feeders where the equipment grounding conductor is installed with the feeder conductors. If you want the feature to show the GEC size, show it in a different column and show the feeder with no ground listed with the feeder conductors so its clear it is not in the conduit.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Photometric calculation schedule

    I would like to suggest that the photometric calculation schedule be a combined schedule for all rooms instead of a dedicated schedule for each single room/space (or both options be available). We are typically asked to provide a single schedule that lists the room/space name in the first column and then the various footcandle columns.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Insert Devices via command line

    Be able to insert a receptacle/device without picking it from the 'Insert Receptacle' form. A command followed by the device name would prompt the user to place the receptacle like they just clicked "OK" after selecting a device.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Set room boundaries to also be light-obstructing rectangles for photometric analysis

    It duplicates work to trace the boundaries of all rooms for energy analysis and circuit naming, then have to trace all the rooms again for photometric analysis. This would likely require the addition of a 'door' object to define places where light-obstructing boundaries would be ignored

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. 4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Import single piece of equipment

    Currently, the "Import Equipment from Another Project" command imports all the equipment. Update that function to allow you to choose specific pieces of equipment to import.

    4 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Circuiting layer dependent on device layer system

    DM's default circuit layer system can be determined by three different options: (1) same as distribution equipment, (2) new, and (3) existing. We'd like a fourth option that makes the circuit layer system match the circuit layer system of the device that's being circuited.

    For example, we're currently designing a job where we are installing new receptacles that are being fed from an existing panel. Our receptacle circuit callouts are coming up under the existing layer system (based off of the panel) instead of the new layer system (based off of the new receptacles). To address this, we changed the…

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Manufacturer Name field included within Notes Settings of distribution equipment

    It would be helpful when creating distribution equipment lists if there was an option for the manufacturer's name. Currently we have to use an unused Note key, rename the label for that key and then remember which Notes Setting corresponds to the list entry.

    3 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base