Design Master Wish List

The current releases are DM Electrical RT 1.3, DM Electrical 8.5, DM HVAC 7.3, and DM Plumbing 4.1. We are not adding new features to these releases.

The next releases will be DM Electrical RT 1.4, DM Electrical 8.6, DM HVAC 7.4, and DM Plumbing 4.2 We are actively working on these release and using this wishlist to guide which features we implement. Some features you see marked as “complete” will not be available until these releases are finished.

How can we improve Design Master?

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Add DC

    For modeling complete solar systems.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  2. Tick marks for more than 1-pole, wire callouts for > #12

    Add another option to "Homerun wire callouts and tick marks" labeled "Tick marks for more than 1-pole , wire callouts for > #12".

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  3. add sub-script option for junction boxes

    Add subscript for junctions boxes like you did for low voltage devices.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  4. Different Layers for New and Existing Items in Schedules

    Use different layers for new and existing circuits in panel schedules or new and existing equipment in equipment schedules.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  5. ADD SECURITY SYMBOLS TO LV OPTIONS

    DOOR STRIKE/DOOR CONTACT
    CAMERA
    MOTION SENSOR
    CARD READER
    KEYPAD

    JUST A FEW EXAMPLES...

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  6. For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for al

    For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for all the fixtures on the posted schedule. That will help expedite the Lighting Power Density calculations required for Energy Code Compliance.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  7. Spaces in Feeder Callouts

    Be able to display feeder callouts with spaces after commas, instead of having all the wire sizes right next to each other.

    Current Callout:
    2''C,2#3/0,#3/0N,#6G

    Desired Callout:
    2''C, 2#3/0, #3/0N, #6G

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  8. Automatically Add "ON" prefix to homerun labels for which a homerun already exists.

    It is customary for circuits that are shared on opposite ends of a building or from one floor to the next to be identifed with multiple homerun symbols, with all but one of those homeruns labeled with "ON <Panel-Ckt>" rather than connecting with a loop. Currently, to do this, the homerun text itself must be modified, and this rarely works well because that text reverts back to the default <Panel-Ckt> text each time the circuits are updated.

    3 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  9. Provide a button (or perhaps under the Cir Opts button) for quicker selection of "Display tick marks on loops"

    I've given up on loop tickmarks for lighting loops (because of all the energy code relay and occupancy sensor requirements); but I still do tickmarks on power loops. It would be great to be able to more quickly toggle between displaying tickmarks on loops.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  10. Recurring Low Voltage Panel

    Create recurring low voltage panels that work like standard recurring panels.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  11. Aim Lamps Separately for Emergency Fixtures

    For fixtures used in the outdoor and egress point-by-point photometrics with two lamps, we need to aim the lamp independently for correct photometrics.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  2 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  12. Define fixed load by phase

    When defining fixed load on a panel schedule allow entry of per phase loads on two and three phase circuits in stead of lumped loads, i.e., on 2-pole circuit be able specify a load for phase A and B on any of the demand categories.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  13. Voltage Drop in Equipment Schedule

    Add "Voltage Drop" as a column to the equipment schedule. Would list the branch circuit voltage drop to a each piece of equipment in the schedule.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  14. Equipment circuit label should be near the equipment symbol--not the equipment label.

    We often turn off printing of equipment label/leader, and use a keynote number with arrow instead. But we have to move the circuit to the equipment symbol, because it ends up under the equipment label (which we are not printing).

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  15. Count devices connected to recurring panels

    Have schedule quantities and takeoffs count the number of items connected to recurring panels.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  16. Support feeder calcs for track lighting

    See NEC 220.43(B). The connected load for the branch circuit is the sum of the wattage of the connected light fixtures. The demand load is an additional 150VA per foot. I would like a place to enter the number of feet of track on a branch circuit so the demand load is calculated correctly in the load summary. We currently accomplish this through a 'Variable Caclulated Load', but it might be more intuitive if there is a 'Length Variable Demand' option. Thank you.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  17. Add load column to receptacle schedule

    Add a column to the receptacle schedule to show the load on the receptacle.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  18. Default elevations for all electrical devices

    You can specific a default elevation for light fixtures in the schedule. Expand this functionality to all types of electrical devices.

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  19. Use Branch Circuit as Main Breaker for Panel

    need a way for a branch breaker to serve as the main in a panelboard and allow it to connect on the oneline

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    medium effort to implement  ·  1 comment  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  20. Current Limiting Panel

    For limiting the current to track lights to meet Energy Code budgets, we use Current Limiting Panels like Silver Bullet. We have to manually size the circuit breakers based on the load on the lighting circuit. The breakers which might be 1, 2, 4, 6, 8 amps, etc. will only handle up to about 80% of their rating due to inrush current to ballasts and LED drivers. So, there is a lot of trial and error and manual calculating to size the breakers. Then the Current Limiting Panel schedule or diagram is updated manually in Acad, which introduces errors and…

    2 votes
    Vote
    Sign in
    (thinking…)
    Password icon
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  0 comments  ·  Electrical  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Feedback and Knowledge Base