David White

My feedback

  1. 7 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  0 comments  ·  Design Master Wish List » HVAC  ·  Flag idea as inappropriate…  ·  Admin →
    David White shared this idea  · 
  2. 63 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    high effort to implement  ·  1 comment  ·  Design Master Wish List » HVAC  ·  Flag idea as inappropriate…  ·  Admin →
    David White supported this idea  · 
    David White commented  · 

    Expand the equipment button to allow a user to build a equipment master schedule. The idea that it would be recognized by DM and also build as schedule as the grille schedule wood. No input for DM on the type equipment would be require, just categories. IE title of schedule, Manufacture, model number, cfm, static pressure, cooling mbh, heating mbh, voltage, phase, amps, and a place for notes. Maybe its simple as you let the user determine how many columns and what to call them.

  3. 32 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    low effort to implement  ·  3 comments  ·  Design Master Wish List » HVAC  ·  Flag idea as inappropriate…  ·  Admin →
    David White supported this idea  · 

Feedback and Knowledge Base